Military training 400-meter obstacle equipment supplier Beijing Armed Police Force special training equipment
search
|
home > sell > Military training 400-meter obstacle equipment supplier Beijing Armed Police Force special training equipment
Military training 400-meter obstacle equipment supplier Beijing Armed Police Force special training equipment
Details Contact information of Shijiazhuang Basketball Office Discount phone number: Landline: - Hours: Sales Manager: Li Ya Supply of 400-meter obstacle equipment for military training The "Standard Assessment Regulations on Physical Exercise for Military Personnel" compiled by Shangmi, the editor of the "Standard Assessment Regulations on Physical Exercise for Military Personnel", points out that the standing or squatting starting method can be used to start the meter obstacle, and starting blocks are not allowed. When conducting the meter obstacle assessment in common military subjects, the starting method must be in a prone position. When issuing the order, the starter uses the starting gun or the starting flag. When blowing the whistle, the raised starting flag immediately waves downward. The starter gives the command to everyone to get into position and fires a gun or whistle. After giving the command to get everyone in position, he should wait until all subjects are stable before firing a gun or blowing a whistle. If the starter believes that the start is unfair or someone has committed a foul, he should blow the whistle to recall all participants and reorganize the start. A test subject from a military training 400-meter obstacle equipment supplier committed two fouls during the starting process, and the subject was disqualified from the test. Military training 400-meter obstacle equipment supplier m obstacle course editor is divided into obstacles, mainly cross piles, trenches, low walls, high board diving platforms, single-plank bridges, high walls and other training facilities m Obstacle field (set) specification editor. Span pile: It consists of a span pile with a diameter of 3 cm and a height of 1 cm above the ground. The midpoints of the three span piles on the right are .3 meters apart and 3 cm from the center line of the runway. The center of the first span pile The distance between the point and the end line is meters. The midpoints of the two span piles on the left are .3 meters apart and . Each is meters. The trench wall should be a vertical surface. 3. Low wall: width meters, height meters, thickness centimeters. Hole width centimeters, height centimeters, military training four hundred meters obstacle equipment supplier lower edge is centimeters from the ground, set On the left side of the low wall. The low wall is mainly composed of wooden boards. High board jumping platform: (High board height. m, length m, width cm, thickness - cm.) High platform height. m, length and width each meter. Low platform height , each meter in length and width. The high board, high platform and low platform are spaced meters apart and are made of bricks and cement. (The high board is made of wood and the supporting material is angle iron.) The horizontal ladder is made of steel garden pipes and is set at least The horizontal bar is 3-cm in diameter, the four upright columns are 3-cm in diameter, and the height is .m.. Single-plank bridge: length is . The lower columns are spaced 3 meters apart. The columns should be painted in red and white colors and are mainly made of steel pipes. High walls: meters wide and high and centimeters thick. Mainly composed of wooden boards. Low pile net: divided into corresponding columns. There are two rows, with a row spacing of meters and a spacing of meters. The piles are centimeters above the ground. Elastic materials are used between each pair of piles to straighten into horizontal lines to form a pile net. The ground under the net is preferably a soft sand layer. The columns are made of steel pipes A total of0articles Related Comments: |